Doha-Mubasher: Qatar Electricity and Water Company’s (QEWC) subsidiary Nebras Power signed a head of agreement (HOA) with the Indonesian national power utility (PLN) to start a feasibility study to construct a power plant in Indonesia.
The HOA also includes a feasibility study for the construction of FSRU for liquefying natural gas to supply the necessary fuel to the plant, according to a bourse filing.
The project capacity will reach around 500 megawatt of electricity, the statement added.
The project commercial operation is expected to begin early 2019, concluded the statement.